The use of suspension clamp for opgw cable needs to be strictly controlled from the early preparation stage. First of all, the construction team needs to conduct a comprehensive inspection of the erection line, accurately evaluate the force of the suspension point according to the type of tower, terrain conditions and meteorological environment, and choose a fixture that matches the specifications based on this.
2025-10-10
More